SU System Applicators

The Extended Lip SU System may be installed by using rubber gloves or hot sticks on distribution voltages up to 34.5kV. The Shot Gun Eye Assembly for the SU System equipment may be purchased separately for installation on the appropriate cover-up device.

Product Options Available

SKUNameDescription
2323Shot Gun Eye Assemblyfor SU Hose / OR134
2340Eye Assemblyfor SU System D.E. Protectors
2359Eye Assemblyfor SU System Insulator Covers

SU System Applicators Features and Benefits

The addition of these eye assemblies enable all SU System equipment to be easily handled with a standard shotgun stick.

SU System Applicators Accessories